Sunday, June 20, 2010

Cabinet Construction




Here is where we are about now....we are coming along and have already had two building inspections.

Happy Father's Day!! Well my darling husband has had nice Father's Day...he has been painting all day, well almost all weekend. He is a big perfectionist, which is why he decided to paint the kitchen and not hire a painting contractor.
--
This weekend was a busy weekend with our final selection of granite for our counter tops. After looking all over for a sink we just couldn't find one that we liked, so we are having one designed in stainless steel. Thank God my father owns a sheet metal company and can design exactly what we want (berlinfoodequipment.com). We also had to pick out a paint color which was hard, because I absolutely loved what we had in the kitchen before. We did end up deciding on a faux finish similar to what we had in our kitchen, but this color we selected after many samples is a much brighter. I think it will look great with the cherry cabinets and the granite counter tops...and so far so good on the walls.
--
We also decided to change the whole design of the hood to something completely different. So we took care of that this weekend as well. People were right when they warned us that the costs of remodeling a kitchen are high and continue to swell as the work goes along. We still have to pick out the faucets and the back splash design for the contractors...in addition to picking out window coverings, crown molding, a new kitchen/dining room set...oh yea and new pots and pans that work with our induction cook top.
--
One thing I must mention is that I have been real happy with our general contractor here on the job, Ray and his crew have been doing a good job. On day one we had a different lead and there were some issues with him Craig was not very happy about. Actually it could have been because I asked the guy if he were Austrian, because of his accent and he gruffly replied "No, I'm Russian"...dead silence followed. I think that got him off on the wrong foot, hey he really did sound Austrian. Now we have this friendly chap from England who is confident in what he does and goes the extra yard for us.
--
The picture is of Craig and his little helper Kylie prepping for the painting....notice how she matched her dad in her light blue t-shirt...she is most definitely her 'Daddy's Girl'. Here's to a wonderful Father's Day...

Saturday, June 19, 2010

Our Kitchen Plans




Our kitchen plans...but these it seems like change day by day, so I guess now these are the plans we began with June 1st. The top plan is of our kitchen work area and the other plan is of our built in china cabinet. If you only knew how long and how many hours it took us to come up with these plans...I only hope we are all happy with the end results.








Wednesday, June 2, 2010

Where Did My Kitchen Go?!



Our cat Spike likes to be the center of attention. He is so dang curious about all the work being done in the kitchen.
Cabinets and lighting all ripped out and floors covered and protected.
Again Spike jumps up in our large garden window as I go to take a picture.

This is the opposite side of the room where a build in china cabinet/combo will eventually go. By the way I love my walls and the color in my kitchen, I kinda want to keep the walls the same....but we'll see.
Okay, so here we are and this is what we (okay darling husband) accomplished over Memorial Weekend. So now we are down to basically a big rectangle box of a room...over the next six to eight weeks (hoping for 6 weeks) this is where the magic and transformation will take place. We can not wait to see our kitchen come to life.


So here is what I wish for over these next few weeks: no worries with the general contractor and crew, great city inspections signed off with no problem (our city has a reputation for being tough on inspections), our project going very smoothly, being extremely pleased with our kitchen....and winning the lotto so we can get our bathrooms done next.... :)


In a nutshell we were suppose to start work yesterday, June 1st, but the construction crew arrived with no permits pulled with our city, so Craig sent them home and told them basically they could not begin work without the permits being pulled. Come to find out permits were suppose to be pulled on Friday but some of the plans were not to their liking (the elevations) so the general contractor had to go rework them. Craig also had some concerns with the construction crew and the lead and he spoke to the project manager and today we got a new crew on and they seem like they are on top of our project.


Today the new crew began work on the electrical part of the project, so Day 1 down of labor. So far so good.